Beranda

Kamis, 23 Agustus 2007

BROSUR IN ENGLISH

“ Wishing for your Prayer and Participation ”

The Al Mukhlisin' s Mosque Development and Construction Committee

Jl. Cendrawasih Komplek Deplu South Gandaria

Fatmawati South Jakarta

Telp./FAX: 021 - 766 0528

Email: yalmics@yahoo. co. id

Blog: http://yalmic.blogspot.com

The Development and Construction of the New Mosque of Al Mukhlisin's Mosque

The Composition of the Management of Al Mukhlisin's Mosque Foundation comprises of :

The Advisory : Drs.H.W.A. Miftach (Chairman); Drs. Tengku A.Gaffar Fadyl (representative);Drs.H. Abu Suud

Drs.H. Adang Rismanto ,MM, H. Tony Bambang Trihartanto, Ph. D. (member).

Supervisor : H.M. Slamet Aang Yamani,SH (chairman); Dr.H. Azhari kasim, Ir.H. Susilo siswo Utomo (member).

Management :H. Bey Yoesoef,SE (chairman); H. Omon Abdul Munir (representative); H. Maskun Siswowaluyo

(Secretary); H. Sofyan Habib (representative) ;H. Hardi Suhardi (.

The Project Committee composition of The Al Mukhlisin' s Mosque Development and Construction Committee:

Advisor : Drs.H. W.A. Miftach, Prof. DR.H. Suharko Kasran, Drs.H. Adang Rismanto's,MM.,DR.H.A.P. Pohan,SH,LLM.

Chairman : DrS. Tengku Gaffar Fadyl.

Vice Chairman : Drs. Bambang Lesmono (Technical).

Vice Chairman : H. Agung Supomo suleiman, SH (Law).

Secretary : H. Sofyan Habib.

Deputy Secretary : Hj. Yati Bambang Trihartanto.

Treasury : H. Maskun Siswowaluyo.

Fund Section :

Chairman : H.M. Slamet Aang Yamani, SH

Member : 1. Ir. H. Susilo Siswoutomo

2. H. Tony Bambang Trihartanto, Ph.D.

3. Dr.H. Azhari Kasim.

4. H. Indra Rinaldo.

5. Drs.H. Hafizd.

6. H. Wisnu Wandoyo Partodipuro.

7. Yuda Djunda,M. It.

8. H. Prayogo Pramuoedji.

9. H. Supadi

10. Ir. Hendarko Rudy Susanto.

11. Drs. H. Harnoko.

12. Anggoro Suryo Putro.

13. H. Hardi Suhardi.

Architect : 1. Ermawan W. (Eme)

2. setyo Pamudji.

Technical Supervisor: 1. Ir. Mukhlis Normal, M.T.

2. Ir. Agus Suryatna.

The Technical Data and the Function of Al Mukhlisin ' s Mosque

The new Building of Al Mukhlisin Mosque will be consisting of 3 ( three) floors, which have different facilities and usage .

The Floor basement constitute the central operation of the mosque, consisting of class room, language laboratory / computer room, meeting room / classes, the Office of the Foundation, the Children Prayer Place, The Islamic Youth of Al Mukhlisin’ s office .

The Second floor is for the purpose of multi function, which can be benefited for all kinds of seminar, training, library, family event and also for additional pray area.

The 3rd floor constitute the main pray area which constitute the clean area for religious daily service performances.

The Floor lay out:

Participation form / Contribution

  1. Name:............................................................................................
  2. Address:........................................................................................

........................................................................................

..........................................................................................

  1. Is willing to donate / participate in the mosque development in form of :

*Cash: Rp...............................................................................................(....................................................................................................................................................)

* Physical (vote for one of):

O. Tower, O. Doom O. interior O. Sanitation

O. Installation O. Sound System O. Furniture

*Wakaf' s certificate : Rp. 1 Million................................ sheet.

Rp. 500 thousand............................ sheet.

Rp. 250 thousand............................ sheet.

*any others ( please specify ) l):..............................................................................................

4. Contribution can be transfer to Account of the Al Mukhlisin' s Mosque Development and Construction Committee .

.

Mandiri Bank, Fatmawati Branch ,

No.Rek. : 127 000467 2414( Rupiah)

No. Rek.: 127 000479 3756( USD)

For more information, please contact:

The Al Mukhlisin' s Mosque Development and Construction Committee .

Jl. Cendrawasih Komplek Deplu, Gandaria Selatan

Fatmawati, Jakarta Selatan

Tlp./Fax:021 - 766 0528

Email: yalmics@yahoo. co. id

Blog: http://yalmic. blogspot. com

Insya Allah, your participation and contribution shall be managed transparently and professionally

The Mosque Development and Constructions Cost Plan and Fund Sources.

The Al Mukhlisin' s Mosque Development and Construction Committee desire to construct a mosque more than just ritual palce but also as the place where the culture and the muslim religion can grow and develop with the community surroundings of the mosque.

Besides as the place for ritual prayer, also for preaching Mohammed SAW prophet’s teaching and the Greatness of Allah’s name , this Mosque Al Mukhlisin will also be utilized as the place for getting knowledge, the creation center, art, business and is function to accommodate the modern Indonesian muslim activities in the development of identity to become more benefit for the nation and society.

The Mosque development cost ( outside / excluding the equipments such as air condition, carpet , lamps, decor) is estimated to be 4 - 5 billion rupiahs, with the detail as follows:

*Rp. 450 million for the main pray area of 144 m2 at the 3rd floor.

*Rp. 1,5 billion for the multi purpose room of 490 m2 at the 2nd floor .

*Rp. 450 million for the ground floor/ basement of 144 m2.

*Rp. 1. 2 billion for development of 1(n) one big doom, 3 little small doom and 4 towers.

*Rp. 200 million for exterior and outside garden of 370 m2.

*Rp. 600 million for the unpredicted cost and engineering cost.

The Mosque construction itself shall be performed by stages beginning by building part of the old building so that the daily prayer can continuously be performed . The Committee will begin the main construction and development of the mosque after collecting all the sufficient funds needed for the constructions of the structure of the base floor and the 2nd floor.

The expected Source of Fund:

-Donation from the institution ( foundation) Abroad as well as domestic .

-Donation form the Close Neighbors Countries .

-From the Central and Regional Government Institutions.

-Donation for companies, Individual donation.

-The selling of Wakaf's Certificate with the nominal o Rp.250.000,- s / d. Rp. 1. 000. 000.-

- The selling of Wakaf's coupon with the nominal of Rp.50.000. s / d. 250.000. -

-The Donation from umat and public society.

“ Insya Allah, the Al Mukhlisin Foundation Komplek Deplu Gandaria Selatan wishes to build a mosque as place for ritual service, and at the same time as a place to get knowledge, center creation, art, welfare and Moslem brotherhood

1 komentar:

Mesjid Al-Mukhlisin mengatakan...

Saya mengucapkan terima kasih yang sebesar besarnya kepada Bp. Agung yang mau mengedit tulisan brosur in english.